Handling guide for modules.
Et solar panel installation manual.
This guide contains information regarding the installation and safe handling of et solar photovoltaic modules hereafter referred to as modules.
For detailed information on the best installation angle refer to standard solar photovoltaic installation guides or consult a reputable solar installer or systems integrator.
The company distributes its solar products and sells its solutions and services to a diversified international utility commercial and.
They produce tier one solar panels with a 15 year product warranty and 25 year performance warranty.
Professional installer must read these guidelines carefully and strictly follow these instructions.
Et solar is a chinese panel manufacturer that was founded in 2005.
Mount the charge controller at the desired location see section 5.
All instructions should be read and understood before attempting installation.
Mounting the solar panels on a flat roof.
Rated electrical characteristics are within 10 percent of measured values at standard test conditions of.
Determine the mounting location of the solar panel s.
W m 25 c cell temperature and am 1 5 solar spectral irradiance.
Unpacking and storage instruction.
Pass the cable from the solar panels to the interior see section 6.
Tüv manual all series iec 2005.
Running the feed return lines from roof to ground level.
Connecting the solar panels to the feed return lines.
Jks is a global leader in the solar industry.
1000 w m2 25 c cell temperature and solar spectral irradiance per astm e 892 or irradiation of am 1 5 spectrum.
The fire rating of a trina solar pv module is valid only when mounted in the manner specified in the mechanical mounting instructions of this installation manual.
The module is considered to be in compliance with ul1703 only when the module is mounted in the manner.
Artificially concentrated sunlight shall not be directed on the module.
Installation manual heliocol solar.
Failure to follow these instructions may result in death injury or.
Wire the battery to the charge controller and then the solar panel to the charge controller ensuring the correct polarity is observed see.
5 1 for safe installation work ul required information.
Assembly of row spacer kits.
Connecting the feed return lines to the filtration system.
While et solar did have an australian office they no longer list it on their contacts page and when i tried to ring them i found their number had been disconnected so it appears they no longer have an australian office.
Version 20160101 purpose of this guide.